Previous story story (News Browser) Next story
Mains replacement program
Thames Water Utilities and Southern Gas Networks have advised Bexley Council that they have started work on an extensive programme of mains replacement works across the borough.
Thames Water is replacing Victorian cast iron water mains as part of an accelerated programme to replace more than 1,100 miles of water mains in London by 2010. The new flexible plastic pipes will be more durable and flexible, and should reduce the number of bursts and leaks.
Southern Gas Networks’ works are the result of a Direction from the Gas Regulator that the entire gas networks must be replaced over the next 30 years.
Belvedere Area
Lower Road to Hailey Rd to Fishers Way
Thames Water
Victoria Mains Replacement Riverside 19
- Reference BB747864
May 07 – April 08
Various
Brook Street, Erith
Lochmere Close To Erith Road
Southern Gas Networks
Gas Main replacement
TBA (Summer 07)
Traffic control main road
Chester Road, Blackfen
Chester Road to Hook Lane
Southern Gas Networks
Gas Main replacement
TBA
Boring underneath A2
Coleman Road, Belvedere
Throughout and into Upper Abbey Road
Southern Gas Networks - Engineer: Craig French
Gas Main replacement
TBA (Summer 07)
Road closure
Crayford Way, Crayford
By j/w The Rise
Thames Water
Trunk Sewer works
April to July 07
Eastry Road, Erith
Throughout
Southern Gas Networks
Gas Main replacement
TBA April – December 07
Local signing and guarding
Erith High Street
By James Watt Way
Southern Gas Networks
Gas Main replacement
TBA
Yet to be decided
Fendyke Road & Florence Road Abbey Wood
Part of each road
Southern Gas Networks
Gas Main replacement
April 07
Local signing and guarding
Holly Hill Road, Erith
Holmhurst Road to Erith Road
Southern Gas Networks
Gas Main replacement
TBA
Yet to be decided
Northend Road, Erith
Peareswood Road to Bridge Road (southbound carriageway)
Southern Gas Networks
Gas Main Replacement
TBA (after Tour De France)
Lane closure Northend Road
Okehampton Crescent, Welling
Upper Wickham Lane to Exmouth Road
Thames Water
Flood Alleviation Scheme
April 07 – October 07
Closure of side road traffic control main road
Ruskin Road, Belvedere
Throughout
Southern Gas Networks
Gas Main replacement
April 07 – May 07
Local signing and guarding
Slade Green Area
Manor Road to Thames Road to Northend Road
Thames Water
Victoria Mains Replacement
Thamesmead Area
Abbey Road to Eastern Way. Harrow Manorway to Maran Way
Thamesmead Area
Exact boundaries as yet unknown
Thames Water
Victoria Mains Replacement
Riverside 20
Provisional date Jan 08 – Oct 08
Works yet to be confirmed
Wallhouse Road, Slade Green
Slade Green Road and including Hilden Drive
Southern Gas Networks
Gas Main replacement
April- July 07
Local signing and guarding
 |
The Jacobean Barn has been given a £400,000 facelift and reopens to the public on Wednesday 11 April. One lucky reader can win a £100.00 dining voucher along with one runner up prize of a £50.00 dining voucher.
Click here for for more details |
|